Example sentences for: mwe
How can you use “mwe” in a sentence? Here are some example sentences to help you improve your vocabulary:
A 500 MWe plant uses roughly 25-32 tons per hour of limestone.
An assumption of 1125 tons of steel is a conservatively high estimate since 500 MWe FGD retrofit installations have been completed with as little as 250 to 375 tons of steel, or 0.5 tons of steel per MWe.
A 2,700 MWe facility requires approximately 1,960,000 man-hours for the retrofit installation.
Estimated AC Injection Rates for a 500 MWe Boiler ...
Based upon the discussion from sections 3.1 through 3.5, the total resources needed for a single 500 MWe plant and a site with seven 500 MWe plants is shown on Table 3-1.